Project Description

Environmental Impact assessment of Project: New access to Pizarra from the link at Cerralba in the A-357.

Preparation of the environmental impact study of a project consisting of the design of a new road lay-out of 1.668,56m long and type 7/10 section.

Two roundabout-type intersections, , two structures of trough girders and concrete slabs, one over the Guadalhorce River of 310 m length and 11 spans of 28,2 m , in addition to another one over the railway track of 81 m and 3 spans of 24-33 and 24 m, as defined above.

The study takes into account the description of the environmental inventory, the identification and appraisal of the anticipated environmental impacts, the proposal of protective and remedial measures and the proposal of the environmental surveillance Program.

The role of CEMOSA

  • Preparation of the environmental impact Study as an integral part of the Preliminary Project.