Project Description

CIVIL WORKS

The supervision and preparation of the Master Plan, Construction Designs and subsequent implementation of the New International Airport of Alcantarí, which will serve the city of Sucre, Bolivia.

  • Parking Platform of 28,000 m2, made of hydraulic concrete with a capacity of four parking spots.
  • Passenger Terminal Building of 5,000 m2 distributed in two floors.
  • Loading Terminal Building located to the south of the Passenger Building Terminal, with a surface area of 1,000 m2 and concrete structure.
  • Control Tower with more than 20 m of height, with a structure of four levels and control room; attached to the building of the Technical segment, with a combined area of 800 m2
  • SSEI building, with a surface area of 500 m2 and with the capacity to meet the future needs of the airport.
  • Additional buildings: electric power plant, building of meteorology, issuers center, access control, fuel supply center, frontage roads and a security-fenced perimeter; as well as its own access, with the construction of a road that will access the airport from the road of Sucre-Yamparáez and new areas of parking with a max capacity for 130 vehicles.

The complex terrain lie of the implementation zone for the new airport makes it necessary to undertake a great movement of land, with a volume of 1,900,000 m3 of excavation and clearing works and approximately 1,600,000 m3 of landfills and embankments.

The role of CEMOSA

  • Master Plan revision by specialized Aeronautical Engineers.
  • Specific flight Fields Monitoring by coordinator
  • Technical office